Main characteristics:
Air Handling Units: 2 pcs 60,000 m³ /h( With rotary heat exchangers) 1 pcs 16.450 m3/h (Wth rotary heat exchangers) 1 pcs 9.000 ni3/h (With rotary heat exchangers) 1 pcs 7,500 m³/h AHU 1 pcs 3,500 m³/h AHU 1 pcs 8,525 m³ /h AHU 1 pcs 1,600 m³ /h AHU Centrifugal chiller: 1 pcs 1,500 kW Cooling towers: 2 pcs 2,230 kW Heating boilers: 1 pcs 1,350 kW Air compressors: 2 pcs 14,16 m3/min. (7,5 bar) water cooled and energy recovered Air dryers: 2 pcs 46,86 n9/min. (-400C twin tower type) Water treatment: 1pcs 71 m³ Automatic back-flush 1 pcs 15m³ /h automatic sand filter 1 pcs 15 m³ /h tiwin tower, automatic water softener 1 pcs 1 m³ /h automatic active carbon filter 1 pcs 12 m³ /h day reverse osmasis unit Fire pumps: 1 pcs 3x55 m³ / h automatic pressured water tank system
Mechanical installations of bu 301 Oversensitive measuring Room (Finemessraum) including building automation systems. (Room designed for constant temperature and humidity conditions.)
Airo cooled chillers: 1 pcs 97 kW Air Handling Units: 1 pcs 3.000 m³/h (With rotary heat exchangers) Smoke exhaust fans: 1 pcs 15.000 m³/h Special radiator: 450 pcs (for cooling) Heat exchanger: 1 pcs 100 kW (Plate type) Circulation pumps: 13 pcs (with frequency control)
(Stinless steel pipes are used for the piping and all pipes are mounted with press connections without welding.)
Air handling units 4 pcs 62,000 m³ / h (with rotary heat exchangers) 6 pcs 60,000 m ³ / h (with rotary heat exchangers) 1 pcs 40,000 m ³ / h(with rotary heat exchangers) 1 pcs 20,000 m³ / h (with rotary heat exchangers) 2 pcs 32,500 m³ / h AHU 1 pcs 15,000 m³ / h AHU 1 pcs 5,000 m³ / h AHU 2 pcs 8,000 m³ / h AHU 1 pcs 27,000 m³ / h AHU 1 pcs 16,500 m³ / h AHU 1 pcs 4,800 m³ / h AHU 1 pcs 16,000 m³ / h AHU Total air volume: 1,900,000 m³ / h Centrifugal chillers: 4 pcs 1,500 kW Cooling towers: 4 pcs 2,230 kW Heating boilers: 2 pcs 3,000Kw dual burner (Natural gas / diesel ) Air compressors: 2 pcs 25 m³ / dak.(7,5 bar) water cooled and energy rocovered 1 pcs 14,16 m³ / dak ( 7,5 bar) water cooled and energy rocovered 2 pcs 0,92 m³/ dak (63 bar ) 2 pcs 3,23 m³ / dak. (10 bar ) Air dryers : 2 pcs 46.8 m³ / dak (-40 ,twin tower type) 2 pcs 1,66 m³/dak. (-70 twin tower type) 2 pcs 3,08 m³ / dak. ( -40 twin tower type) Fire pumps: 1 pcs 284 m³ / h with diesel engine 1 pcs 284 m³ / h with electrical motor 1 pcs 3,6 m³ / h jokey fire pump.
Energy recovered air handling units 3 pcs 45.000 m³/h (With Rotating Heat Exchanger) 4 pcs 10.000 m³/h (air to water heat recovered) 10 pcs 45.000 m³/h (existing AHU) Total air volume: 1.015.000 m³/h Centrifugal chillers: 2 pcs 1.500 kW Cooling towers: 1 pcs 2.230 kW Water softener units: 1 pcs 20 m³/h automatic water softener
Main characteristics: Energy recovered air handling units 4 pcs 60.000 m³/h (With Rotating Heat Exchanger) 1 pcs 85.000 m³/h (With Rotating Heat Exchanger) 1 pcs 80.000 m³/h (With Rotating Heat Exchanger) 2 pcs 9.800 m³/h (With Rotating Heat Exchanger) 3 pcs 3.300 m³/h (Plate type heat recovered) Total air volume: 900.000 m³/h Centrifugal chillers 3 pcs 1.500 kW water cooled with reciprocating compressor Cooling towers: 4 pcs 1.850 kW with radial ventilator Heating boilers: 1 pcs 3.000 kW scotch type steel boiler burning natural gas Air Compressor: 3 pcs 13.2 m³/min. Water cooled and energy recovered 2 pcs 27 m³/min. Water cooled with compressed air dryers Water softener units: 2 pcs 15 m³/h twin tower, automatic water softener Fire pumps: 1 pcs 284 m³/h with diesel motor 1 pcs 284 m³/h with electrical motor 1 pcs 3.6 m³/h jokey fire pump 2.250 pcs sprinkler head
Energy recovered air handling units: 3 pcs 45.000 m³/h (Air to water heat recovered) 1 pcs 5.000 m³/h (Plate type heat recovered) *Total air volume: 230.000 m³/h
Energy recovered air handling units: 3 pcs 45.000 m³/h AHU 2 pcs 15.000 m³/h AHU 1 pcs 5.000 m³/h AHU Total air volume: 170.000 m/h
Energy recovered air handling units : 5 pcs 45.000 m³/h
Total air volume: 225.000 m³/h
Our Works completed in 2005.
Our Works completed in 2004.
BOSCH BRAKE SYSTEM AND TRADE CO.
BOSCH HEATING EQUIPMENT IND & CO.
BOSCH-REXROTH CO.
BOSCH SAN. VE TİCARET CO.
Our Works completed in 2003.
Our Works completed in 2002.
Our Works completed in 2001.
Our Works completed in 1998.
Our Works completed in 1997.
Our Works completed before 1997.
TYUMEN MEDICAL CENTER Heating, cooling and ventilation of Tyumen Medical Center, hospıtal having 360 beds, 25 operation rooms and hotel complex having 200 bed. Construction area : 40.000 m2
TYUMEN NEFTIHIMBANK Heating and ventilation installations of Tyumen Neftihimbank.
MOSCOW INDUSTRIAL BANK Mechanical installations, project and controlling of Moscow Industrial Bank's Zelenograd Branch.
TYUMEN ANTALYA FAST FOOD Heating and ventilation installation of Tyumen " Antalya Fast Food".
MOSCOW TAX OFFICE Heating and ventilation installations of Moscow Tax Office.
MOSCOW NEGLINNAYA STOLICHNY BANK Cooling and ventilation installations of Moscow Neglınnaya Stolichny Savings Bank
MOSCOW MOSBUSINESS BANK Heating, cooling, ventilation and fire protection installations of Moscow Mosbusiness Bank Zelenograd Branch.
Cooling Units: 2 pcs 1.500 kW, air cooled, with reciprocating compressor 1 pcs 420 kW air cooled, with reciprocating compressor Heating Boilers: 3 pcs 1.050 kW cast iron Fan-Coil: 688 pcs Hydronic cassette type 100 pcs Fan-coil vertical units with cabinet Fire Pumps: 2 pcs 290 m3 /h with electrical motor 1 pcs 4 m3/h jokey fire pump Air Handling Units: 11 pcs AHU 25 pcs exhaust fan Total air volume: 520,000 m³ /h
HVAC project and installations of Ottoman Bank Branches;
Other divisons of Ottoman Bank:
HVAC Project and installations of Tekfenbank branches :
West Deutsche Landes Bank (Europa) AG Central Building İstanbul
Total heating capacity: 516.000 kcal/h Total cooling capacity: 417.000 kcal/h Total air volume: 30.000 m3/h
HVAC and cold room design and installations of Tansaş Supermarkets.
HVAC project and installations of Esbank branches;
GARANTİ BANK
TÜRKİYE VAKIFLAR BANK
T. EMLAK BANK
TOPRAKBANK
T. EKONOMİ BANK
HSBC BANK
TRANS ARABİAN INVESTMENT BANK
WESTDEUTSCHE LANDES BANK (EUROPE) AG
Heating, cooling, Ventilation and Automatic control installations completed by us.
TOPÇU İNŞAAT TURİZM VE TİC.CO.
FACO CO.
DOĞUŞ OTOMOTİV
TFF -TÜRKİYE FUTBOL FEDERASYONU
METEM TEKSTİLCO.
MEGA TEKSTİL CO.
OYAK BANK CO.
GARANTİ BANK CO.
AL-DAR HOSPITAL