  REFERENCES



  AUTOPIA
  BOSCH - REXROTH CO. (Bu 5), BURSA
  BOSCH - REXROTH CO. (Bu 5), BURSA
  BOSCH REXROTH CO. GEBZE
  TYUMEN SIBERIA SANATORIUM
  TAZOVSKI COMPLEX, RUSSIA
  GAS STATION, ASGHABAT
  RITZ CARLTON HOTEL - MOSCOW
  BPLAS FACTORY, ADAPAZARI
  BOSCH - REXROTH CO.
  BOSCH 2004
  BOSCH 2001 (Bu 3)
  BOSCH 2001 (Bu 1)
  BOSCH 2000 (Bu 1)
  BOSCH (Bu 109 - Bu 110)
  BOSCH (Bu 102a)
  BOSCH (Bu 102)
  BOSCH (Bu 101)
  BOSCH 1988 - 2003
  BOSCH 2003 - 2007
  RUSSIAN FEDERATION
  OYAK BANK (ING BANK)
  OSMANLI BANK (OTTOMAN BANK)
  TEKFENBANK HEAD OFFICE (EUROBANK TEKFEN)
  TEKFENBANK BRANCHES
  TEKFEN CONSTRUCTION TRADING CO.
  DOĞUŞ HOLDING CO.
  DOĞUŞ CONSTRUCTION CO.
  GARANTİ INVESTMENT BANK
  GARANTİ LEASING
  TANSAŞ SUPER MARKET
  ESBANK BRANCHES
  BANK BRANCHES
  AND OTHERS 2003-2007)
  AND OTHERS (1988-2003)
















PROJECT: AUTOPIA
Date of Completion: 2010


Please click here to enlarge



Please click here to enlarge


Description of the Work: Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations. Turkey's firs automobile Mall Autopia's 1 St. Stoge mechanical installations.

< Geri







PROJECT: BOSCH - REXROTH CO. (Bu 5), BURSA
Date of Completion: 2009


Please click here to enlarge



Please click here to enlarge



Please click here to enlarge


Construction Area: 63.000 m2
Description of the Work: Mechanical installations and building automation of Bosch Rexroth Bursa “Bu 501-502-503” Main System Buildings and “Bu 505-506-507-508” Auxillary System Buildings. Heating, cooling, ventilation, compresed air, process ventilation, fire protection, heat recovery systems, water treatment, electrical control panels, building automation systems, seismic systems and vibration isolation.

Main characteristics:
  • Air handling units :

  • 7 pcs 63.000 m3/h (with rotary heat exchangers)
    4 pcs 56.250 m3/h (with rotary heat exchangers)
    1 pcs 50.000 m3/h (with rotary heat exchangers)
    1 pcs 20.000 m3/h (with rotary heat exchangers)
    1 pcs 24.000 m3/h AHU
    1 pcs 16.000 m3/h AHU
    1 pcs 14.250 m3/h AHU
    1 pcs 12.000 m3/h AHU
    2 pcs 10.000 m3/h AHU
    1 pcs 7.500 m3/h AHU
  • Centrifugal Chillers :
    4 pcs 2.000 kW, water cooled centrifugal chiller
    1 pcs 2.000 kW, water cooled centrifugal chiller, VFD Driven
  • Cooling towers :
    7 pcs 2.230 kW
  • Heating boilers :
    2 pcs 3.050 kW natural gas fired boilers
  • Compresed air units :
    1 pcs 800 m3/h 7,5 bar water cooled, screwed air compressors, energy recovered, VFD Driven 3 pcs 1.700 m3/h 7,5 bar water cooled screwed air compressors,
    energy recovered 3 pcs 1.875 m3/h air dryers (-40°, twin tower type).
  • Water traetment units :
    1 pcs 35 m3/h Automatic sand filter
    1 pcs 8 m3/h Automatic sand filter
    1 pcs 4 m3/h Automatic sand filter
    2 pcs 35 m3/h Automatic water softener
    1 pcs 8 m3/h Twin tower, automatic water softener
    1 pcs 4 m3/h Twin tower, automatic water softener
    1 pcs 8 m3/h Automatic active carbon filter
    1 pcs 6 m3/h Automatic active carbon filter
    1 pcs 3,6 m3/h Dual type reverse osmosis units
    2 pcs 8 m3/h Ultraviolet sterilization system
  • Fire pumps :
    1 pcs 284 m3/h With diesel engine
    1 pcs 284 m3/h With electrical engine
    1 pcs 3,6 m3/h Jockey pump
  • Precision air conditioning units :
    1 pcs 15 kW Air cooled condensered

< Back







PROJECT: BOSCH - REXROTH CO. (Bu 5), BURSA
Date of Completion: 2009


Please click here to enlarge



Please click here to enlarge



Please click here to enlarge


Construction Area: m2
Description of the Work: Mechanical installations and building automation system (BAS) of Oversensitive Measuring Room (Finemessraum) in Bosch Rexroth Bursa Bu 5 factories. (Room designed for constant temparature and humidity conditions.)

    Heating,
    Cooling (with radiators),
    Ventilation,
    Smoke extraction,
    Fire protection,
    Buliding automation systems (BAS).

Main characteristics:
    • Air cooled chiller : 1 pcs 49 kW
    • Air handling unit : 1 pcs 2.000 m3/h, with steam humidifier unit (with rotary heat exchangers)
    • Smoke exhaust fan : 1 pcs 5.000 m3/h
    • Special radiator : 222 pcs (for cooling)
    • Heat exchanger : 1 pcs 50 kW (plate type)
    • Circulation pumps : 18 pcs VFD Driven

< Back







PROJECT: BOSCH REXROTH CO., GEBZE
Date of Completion: 2009


Please click here to enlarge



Please click here to enlarge


Please click here to enlarge



Please click here to enlarge



Please click here to enlarge


Construction Area: 8.600 m2
Description of the Work: Mechanical installations of Bosch Rexroth Gebze Factory Management and Production building.
    Heating,
    Cooling,
    Ventilation,
    Compressed air,
    Fire protection,
    Heat recovery systems,
    Water softening,
    Irrigation systems,
    Solar energy systems,
    Electrical control panels,
    Building automation systems.



Main characteristics:
  • Air handling units :
  • 1 pcs 24.000 m3/h (With rotary heat exchangers)
    1 pcs 21.000 m3/h (With rotary heat exchangers)
    1 pcs 6.000 m3/h (With rotary heat exchangers)
    1 pcs 7.500 m3/h AHU
  • Chillers :

  • 2 pcs 350 kW, Air cooled scroll compressors.
  • Heating boilers :

  • Wall mounted gas fired condensing boiler as cascade of 7 units (100 kW)
  • Solar Energy System :

  • For domestic hot water system.
    15 pcs Flat-plate collectors, with pumping and actuating systems.
  • Air compressors :

  • 1 pcs 500 m3/h, 7,5 bar air cooled screwed air compressors, energy recovered, VFD Driven.
  • Water softening unit :

  • 1 pcs 4 m3/h automatic.
  • Fire pumps :

  • 1 pcs 227 m3/h with diesel engine,
    1 pcs 227 m3/h with electrical motor,
    1 pcs 4,6 m3/h jockey pump.


< Back







PROJECT: TYUMEN SIBERIA SANATORIUM
Date of Completion: 2009


Please click here to enlarge



Please click here to enlarge



Please click here to enlarge


Construction Area: 17.000 m2
Description of the Work: Tyumen Siberia Sanatorium project;
mechanical installation works of superstructure and infrastructure
    Heating,
    Ventilation,
    Sanitary,
    Fire protection installations,
    All infrastructure works,
    Automatic control system,
    Pool installations,

Main characteristics:

  • Air handling units :

    • 2 pcs 18.000 m3/h AHU
      1 pcs 8.700 m3/h AHU
      1 pcs 15.330 m3/h AHU
      1 pcs 9.560 m3/h AHU
      1 pcs 25.000 m3/h AHU
      1 pcs 6.240 m3/h AHU
      1 pcs 11.840 m3/h AHU
      1 pcs 12.240 m3/h AHU
  • Plate type heat exchanger :

    • 1 pcs 2.400 kW
      2 pcs 53 kW


    < Back







    PROJECT: TAZOVSKI COMPLEX, RUSSIA
    Date of Completion: 2009


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 7.500 m2
    Description of the Work: Tazovsky School Dormitory and Sports Hall projects; mechanical installation works of superstructure and infrastructure
      Heating,
      Ventilation,
      Sanitary,
      Fire protection installations,
      All infrastructure works,
      Automatic control system.
    Main characteristics:
    • Air handling units :
    • 1 pcs 16.405 m3/h AHU
      1 pcs 19.330 m3/h AHU
      1 pcs 10.020 m3/h AHU
      1 pcs 10.865 m3/h AHU
      1 pcs 5.750 m3/h AHU
      1 pcs 10.400 m3/h AHU
      1 pcs 8.200 m3/h AHU
    • Plate type heat exchanger :
    • 1 pcs 1.212 kW
      5 pcs 500 kW
      1 pcs 243 kW
      1 pcs 191 kW

    < Back







    PROJECT: GAS STATION, ASGHABAT
    Date of Completion: 2008


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 1.000 m2 (Land: 2 hectare)
    Description of the Work: Electrical & mechanical, installations of Babarap and AZS90 Gas Station in Ashgabat. Preparation of preliminary & execution projects,
    B.O.Q and specifications.
      Heating,
      Cooling,
      Ventilation,
      Fire protection,
      Domestic water,
      Sewage water,
      Irrigation system,
      Rain water,
      Electrical installations,
      Pump and tank automation system,
      Process installations.
    Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin

    < Back







    PROJECT: RITZ CARLTON HOTEL - MOSCOW
    Date of Completion: 2006-2007


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 55.000 m2
    Description of the Work: Ritz Carlton Moscow Hotel building's,
    • Heating installations,
    • Cooling installations,
    • Mechanical room installations,
    • Fire protection installations
    • As-built projects.
    Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin

    < Back







    PROJECT: BPLAS FACTORY, ADAPAZARI
    Date of Completion: 2006


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 15.000 m2
    Description of the Work: Mechanical installations of B Plas factory buildings in Adapazari.

    Main characteristics:

    • Centrifugal chiller :1 pcs 414,8 kW (Comfort)
    • :3 pcs 410kW (Process )
    • Heating boilers : 1 pcs 310 kW
    • Air compressors :2 pcs 12 m³ /h
    • Air handling units :1 pcs 1500 m³/ h
    • Fire pumps :1 pcs 2x12,5 m³ / h
    • Fan-coil units :95 pcs
    • Circulation pumps :8 pcs
    Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin

    < Back







    PROJECT: BOSCH-REXROTH CO.
    Date of Completion: 2005


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 21.000 m2
    Description of the Work: Bosch Rexroth CO. Bu 400 fabrika binasının tüm mekanik tesisatı ve bina otomasyonu işleri. (Ön proje, uygulama projesi, ısıtma, soğutma (konfor/proses), havalandırma, ısı Back kazanım sistemleri, basınçlı hava, yangından korunma, su arıtma sistemleri, elektrik ve otomasyon kumanda panoları, bina otomasyon sistemi, pnömatik havalandırma klapeleri, sıcak su dağıtım merkezi tetisatlarının yapılması.)

    Main characteristics:

    Air Handling Units:
    2 pcs 60,000 m³ /h( With rotary heat exchangers)
    1 pcs 16.450 m3/h (Wth rotary heat exchangers)
    1 pcs 9.000 ni3/h (With rotary heat exchangers)
    1 pcs 7,500 m³/h AHU
    1 pcs 3,500 m³/h AHU
    1 pcs 8,525 m³ /h AHU
    1 pcs 1,600 m³ /h AHU

    Centrifugal chiller: 1 pcs 1,500 kW

    Cooling towers:
    2 pcs 2,230 kW

    Heating boilers:
    1 pcs 1,350 kW

    Air compressors:
    2 pcs 14,16 m3/min. (7,5 bar) water cooled and energy recovered

    Air dryers:
    2 pcs 46,86 n9/min. (-400C twin tower type)

    Water treatment:
    1pcs 71 m³ Automatic back-flush
    1 pcs 15m³ /h automatic sand filter
    1 pcs 15 m³ /h tiwin tower, automatic water softener
    1 pcs 1 m³ /h automatic active carbon filter
    1 pcs 12 m³ /h day reverse osmasis unit

    Fire pumps: 1 pcs 3x55 m³ / h automatic pressured water tank system


    < Back







    Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin
    PROJECT: BOSCH 2004
    Date of Completion: 2004


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 1.000 m2
    Description of the Work:

    Mechanical installations of bu 301 Oversensitive measuring Room (Finemessraum) including building automation systems. (Room designed for constant temperature and humidity conditions.)

    • Heating,
    • Cooling,
    • Ventilation,
    • Fire protection,
    • Building automation systems.

    Main characteristics:

    Airo cooled chillers: 1 pcs 97 kW

    Air Handling Units: 1 pcs 3.000 m³/h (With rotary heat exchangers)

    Smoke exhaust fans: 1 pcs 15.000 m³/h

    Special radiator: 450 pcs (for cooling)

    Heat exchanger: 1 pcs 100 kW (Plate type)

    Circulation pumps: 13 pcs (with frequency control)

    (Stinless steel pipes are used for the piping and all pipes are mounted with press connections without welding.)


    < Back







    PROJECT: BOSCH 2001(Bu 3)
    Date of Completion: 2001


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 37.500 m2
    Description of the Work: Bosch " Bu 301", "Bu 302 ", "Bu 304", " 305", "Bu 306 " and "Bu 307," New Factory Buldings automation and building automation system Preparation of preliminary & execution Project, heating ,cooling,ventilation Compressed air (low,medium,high), heat rocevery systems, fire protection, Water treatment, boiler room,building automation and electrical systems Design and installation.

    Main characteristics:

    Air handling units
    4 pcs 62,000 m³ / h (with rotary heat exchangers)
    6 pcs 60,000 m ³ / h (with rotary heat exchangers)
    1 pcs 40,000 m ³ / h(with rotary heat exchangers)
    1 pcs 20,000 m³ / h (with rotary heat exchangers)
    2 pcs 32,500 m³ / h AHU
    1 pcs 15,000 m³ / h AHU
    1 pcs 5,000 m³ / h AHU
    2 pcs 8,000 m³ / h AHU
    1 pcs 27,000 m³ / h AHU
    1 pcs 16,500 m³ / h AHU
    1 pcs 4,800 m³ / h AHU
    1 pcs 16,000 m³ / h AHU

    Total air volume: 1,900,000 m³ / h

    Centrifugal chillers: 4 pcs 1,500 kW

    Cooling towers: 4 pcs 2,230 kW

    Heating boilers:
    2 pcs 3,000Kw dual burner (Natural gas / diesel )

    Air compressors:
    2 pcs 25 m³ / dak.(7,5 bar) water cooled and energy rocovered
    1 pcs 14,16 m³ / dak ( 7,5 bar) water cooled and energy rocovered
    2 pcs 0,92 m³/ dak (63 bar )
    2 pcs 3,23 m³ / dak. (10 bar )

    Air dryers :
    2 pcs 46.8 m³ / dak (-40 ,twin tower type)
    2 pcs 1,66 m³/dak. (-70 twin tower type)
    2 pcs 3,08 m³ / dak. ( -40 twin tower type)

    Fire pumps:
    1 pcs 284 m³ / h with diesel engine
    1 pcs 284 m³ / h with electrical motor
    1 pcs 3,6 m³ / h jokey fire pump.


    < Back







    PROJECT: BOSCH 2001(Bu 1)
    Date of Completion: 2001


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 22.000 m2
    Description of the Work: "Bu 101", "Bu 101c", "Bu 102", "Bu 102a" Factory Building's cooling installations additional heating/ventilation installations and system automation in Bursa.
    • Preparation of preliminary & execution projects,
    • Heating,
    • Cooling,
    • Ventilation,
    • Process ventilation installations,
    • Heat recovery systems,
    • Building automation systems,
    • Electrical systems design and installation.

    Main characteristics:

    Energy recovered air handling units
    3 pcs 45.000 m³/h (With Rotating Heat Exchanger)
    4 pcs 10.000 m³/h (air to water heat recovered)
    10 pcs 45.000 m³/h (existing AHU)

    Total air volume: 1.015.000 m³/h

    Centrifugal chillers: 2 pcs 1.500 kW

    Cooling towers: 1 pcs 2.230 kW

    Water softener units: 1 pcs 20 m³/h automatic water softener


    < Back







    PROJECT: BOSCH 2000(Bu 1)
    Date of Completion: 2000


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 3.000 m2

    Description of the Work:
    • Mechanical installations and building automation systems of "Bu 111" Dining Hall Building in Bursa.
    • Heating,
    • Cooling,
    • Ventilation,
    • Automatic control systems.
    Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin

    < Back







    PROJECT: BOSCH (Bu 109 - Bu 110)
    Date of Completion: 1999


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 19.500 m2
    Description of the Work: Mechanical installations and building automation systems of "Bu 109" and "Bu 110" Common Rail System Production Building's in Bursa. Preparation of preliminary & execution projects, B.O.Q. and specifications.
    • Heating,
    • Cooling (comfort/process),
    • Ventilation,
    • Compressed air,
    • Fire protection installations,
    • Heat recovery systems,
    • Soft and pure water preparation,
    • Electrical control panels,
    • Building automation systems,
    • Pneumatic ventilation valve,
    • Additional boiler room installations. ( 3MW)

    Main characteristics:
    Energy recovered air handling units
    4 pcs 60.000 m³/h (With Rotating Heat Exchanger)
    1 pcs 85.000 m³/h (With Rotating Heat Exchanger)
    1 pcs 80.000 m³/h (With Rotating Heat Exchanger)
    2 pcs 9.800 m³/h (With Rotating Heat Exchanger)
    3 pcs 3.300 m³/h (Plate type heat recovered)

    Total air volume: 900.000 m³/h

    Centrifugal chillers
    3 pcs 1.500 kW water cooled with reciprocating compressor

    Cooling towers: 4 pcs 1.850 kW with radial ventilator

    Heating boilers:
    1 pcs 3.000 kW scotch type steel boiler burning natural gas

    Air Compressor:
    3 pcs 13.2 m³/min. Water cooled and energy recovered
    2 pcs 27 m³/min. Water cooled with compressed air dryers

    Water softener units:
    2 pcs 15 m³/h twin tower, automatic water softener

    Fire pumps:
    1 pcs 284 m³/h with diesel motor
    1 pcs 284 m³/h with electrical motor
    1 pcs 3.6 m³/h jokey fire pump
    2.250 pcs sprinkler head


    < Back







    PROJECT: BOSCH (Bu 102a)
    Date of Completion: 1998


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 6.600 m2
    Description of the Work: Mechanical installations and building automation. systems of Bursa, "Bu 102a" New Factory Building in Bursa.
    • Heating,
    • Ventilation,
    • Compressed air,
    • Hot/cold water preparation,
    • Heat recovery systems,
    • Automatic control systems,
    • Electrical control panels.

    Main characteristics:

    Energy recovered air handling units:
    3 pcs 45.000 m³/h (Air to water heat recovered)
    1 pcs 5.000 m³/h (Plate type heat recovered)

    *Total air volume: 230.000 m³/h


    < Back







    PROJECT: BOSCH (Bu 102)
    Date of Completion: 1996


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 6.000 m2
    Description of the Work: Mechanical installations and automatic control systems of Bursa, "Bu 102" Factory Building's.
    • Heating,
    • Ventilation,
    • Compressed air,
    • Hot/cold water preparation,
    • Heat recovery systems,
    • Automatic control systems,
    • Electrical control panels,
    • Pneumatic ventilation value.

    Main characteristics:

    Energy recovered air handling units:
    3 pcs 45.000 m³/h AHU
    2 pcs 15.000 m³/h AHU
    1 pcs 5.000 m³/h AHU

    Total air volume: 170.000 m/h


    < Back







    PROJECT: BOSCH (Bu 101)
    Date of Completion: 1989


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 5.500 m2
    Description of the Work: Mechanical installations and automatic control systems of Bursa, "Bu 101" Factory Building's.
    • Heating,
    • Ventilation,
    • Compressed air,
    • Hot/cold water preparation,
    • Heat recovery systems,
    • Automatic control systems,
    • Electrical control panels,
    • Pneumatic ventilation valves.

    Main characteristics:

    Energy recovered air handling units : 5 pcs 45.000 m³/h

    Total air volume: 225.000 m³/h


    < Back













    PROJECT: BOSCH 2003-2007

    Our Works completed in 2005.

    • Project design and mechanical installations of Piezo PDMM Room including building automation systems.
    • Project design and mechanical installations of Bu 105 additional chillers including building automation systems.
      Project design of Carbon Coating Room including building automation systems.

    Our Works completed in 2004.

    • Project design and mechanical installations of SIS Room including building automation systems.
    • Project design and mechanical installations of QSG6 Measuring Room.
    • Project design and mechanical installations of QSG6 Pattern Room.
    • Project design and mechanical installations of Zeis Measuring Room.
    • Project design of Bu 107 Security & Info Building.

    BOSCH BRAKE SYSTEM AND TRADE CO.

    Our Works completed in 2004.

    • Project design and electro-mechanical installations, automatic control systems of super heated water & oil systems.
    • Project design fire protection and pressured water tank systems of Bursa Factory Buildings.

    BOSCH HEATING EQUIPMENT IND & CO.

    • Project design of Bosch Man 101-102 additional Factory Buildings.

    BOSCH-REXROTH CO.

    • Mechanical installations of KSS plant.



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    < Back







    PROJECT: BOSCH 1988-2003

    BOSCH SAN. VE TİCARET CO.

    Our Works completed in 2003.

    • Ventilation installations of "Bu 304" Refinement Building.
    • Ventilation system modifications of "Bu 102" Factory Building's Sensible Measurrement Room.
    • Additional cooling group and cooling tower design of "Bu 105" Energy Production Building.
    • Dehumidifying installations and project preparation of "Bu 101d" Warehouse.
    • Fire protection installations of "Bu 101","Bu 102"Factory Buildings.
    • Cooling installations design and execution of "Bu 109" DL Raum Building.
    • Cooling tower project revision and additional cooling equipment design of "Bu 105" Energy Production Building.
    • Hydrant installations revision works of "Bu 100" Building.

    Our Works completed in 2002.

    • "Bu 104" Gas and Tank Foundation's mechanical systems design installations.
    • Fire protection systems design of "Bu 101 and "Bu 102"Production Buildings.
    • Cooling towers installations of "Bu 112" Energy Production Building.
    • Cooling and ventilation installations of "Sensitive Measuring Room"

    Our Works completed in 2001.

    • Mechanical installations systems design of "Bu 100b" İdari Bina mekanik tesisat uygulama projelerinin hazırlanması.

    Our Works completed in 1998.

    • Ventilation, automation systems of "Bu 108"Refinement Building.
    • HVAC project of "DHK"montage area.

    Our Works completed in 1997.

    • Heating and cooling installations of "Bu 107"Security Offices.
    • HVAC Project of "DHK" assembly area.

    Our Works completed before 1997.

    • Compressed air systems installations of Bursa factory building.
    • Process cooling systems design and installations in Bursa
    • Heating and ventilation installation of Topkapı-İstanbul Building.
    • Ventilation design and installation of Bursa "New Hordening Section"
    • Heating, ventilation and cooling installations of Bursa "Bu 100a"Building Conference Room.
    • Heating and ventilation installations of Bursa "Bu 102" Building generator test cabinets.
    • Cooling and ventilation installations of Bursa "Bu 102" Building EHD Office.
    • Cooling and ventilation installations of Bursa "Bu 101" Tea rooms.
    • Cooling towers systems of Bursa "Bu 105" Mechanical Systems Building
    • Cooling and ventilation installations of Bursa "Bu 102" Building QSG1 office.



    Please click here to enlarge



    Please click here to enlarge



    < Back







    PROJECT: RUSSIAN FEDERATION

    TYUMEN MEDICAL CENTER
    Heating, cooling and ventilation of Tyumen Medical Center, hospıtal having 360 beds, 25 operation rooms and hotel complex having 200 bed.
    Construction area : 40.000 m2

    TYUMEN NEFTIHIMBANK
    Heating and ventilation installations of Tyumen Neftihimbank.

    MOSCOW INDUSTRIAL BANK
    Mechanical installations, project and controlling of Moscow Industrial Bank's Zelenograd Branch.

    TYUMEN ANTALYA FAST FOOD
    Heating and ventilation installation of Tyumen " Antalya Fast Food".

    MOSCOW TAX OFFICE
    Heating and ventilation installations of Moscow Tax Office.

    MOSCOW NEGLINNAYA STOLICHNY BANK
    Cooling and ventilation installations of Moscow Neglınnaya Stolichny Savings Bank

    MOSCOW MOSBUSINESS BANK
    Heating, cooling, ventilation and fire protection installations of Moscow Mosbusiness Bank Zelenograd Branch.




    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    < Back







    PROJECT: OYAK BANK (ING BANK)
    Date of Completion: 1998


    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge


    Construction Area: 37.600 m2
    Description of the Work: Mechanical installations and building automation systems of Oyak Bank Head Office Building
    • Preparation of preliminary & execution projects,
    • B.O.Q.and specifications ,
    • Heating,
    • Cooling,
    • Ventilation,
    • Fire protection,
    • Sanitary,
    • Sewage,
    • Domestic water,
    • Rain water installations,
    • Building automation system,
    • Electrical control panels,
    • Automatic control systems.

    Main characteristics:

    Cooling Units:
    2 pcs 1.500 kW, air cooled, with reciprocating compressor
    1 pcs 420 kW air cooled, with reciprocating compressor

    Heating Boilers: 3 pcs 1.050 kW cast iron

    Fan-Coil:
    688 pcs Hydronic cassette type
    100 pcs Fan-coil vertical units with cabinet

    Fire Pumps:
    2 pcs 290 m3 /h with electrical motor
    1 pcs 4 m3/h jokey fire pump

    Air Handling Units:
    11 pcs AHU
    25 pcs exhaust fan

    Total air volume: 520,000 m³ /h


    < Back







    PROJECT: OSMANLI BANK (OTTOMAN BANK)

    HVAC project and installations of Ottoman Bank Branches;

    1 Adapazarı 40 Karaköy/İstanbul
    2 Alanya /Antalya 41 Karşıyaka/İzmir
    3 Alsancak/İzmir 42 Kartal/İstanbul
    4 Altınbakkal/İstanbul 43 Kayseri
    5 Altunizade/İstanbul 44 Kazasker/İstanbul
    6 Anafartalar/Ankara 45 Konya
    7 Antakya/Hatay 46 Kozyatağı/İstanbul
    8 Antalya 47 Köroğlu/Ankara
    9 Avcılar/İstanbul 48 Kuşadası/İzmir
    10 Aydın 49 Levent/İstanbul
    11 Ayvalık/Balıkesir 50 Malatya
    12 Antalya / Çarşı Branch 51 Manavgat/Antalya
    13 Bakırköy/İstanbul 52 Manisa
    14 Balıkesir 53 Marmaris/Muğla
    15 Bandırma/Balıkesir 54 Mecidiyeköy/İstanbul
    16 Bayrampaşa/İstanbul 55 Merkez/Adana
    17 Beşiktaş/İstanbul 56 Merkez/Ankara
    18 Bodrum/Muğla 57 Merkez/İzmir
    19 Bornova/İzmir 58 Mersin/İçel
    20 Caddebostan/İstanbul 59 Merter/İstanbul
    21 Carrefour/İstanbul 60 Mimar Sinan/Kayseri
    22 Çamdibi/İzmir 61 Osmanbey/İstanbul
    23 Çarşı/Antalya 62 Ostim/Ankara
    24 Çiğli/İzmir 63 Pendik/İstanbul
    25 Çorlu/İstanbul 64 Samsun
    26 Demirtaş/Bursa 65 Şaşkınbakkal/İstanbul
    27 Denizli 66 Şişli/İstanbul
    28 Eskişehir 67 Taksim/İstanbul
    29 Etiler/İstanbul 68 Tarsus/Mersin
    30 Feneryolu/İstanbul 69 Tekirdağ
    31 Gaziantep 70 Tarsus/İçel
    32 Gebze/İzmit 71 Tekirdağ
    33 Güneşli/İstanbul 72 Üsküdar/İstanbul
    34 Heykel/Bursa 73 Yeni sanayi/Ankara
    35 İmes-Dudullu/İstanbul 74 Yenicami/İstanbul
    36 İskenderun/Hatay 75 Yeşilköy Serbest Bölge/İstanbul
    37 İzmit/kocaeli 76 Yeşilköy/İstanbul
    38 Kabataş/İstanbul 77 Zonguldak
    39 Kadıköy/İstanbul    

    Other divisons of Ottoman Bank:

    • Ankara Merops (Central operation building)
    • Ege Merops (Central operation building)
    • Beyoğlu, Historical Research building
    • Bulgur Palas, Archives building
    • Bulgur Palas, additional archives building.
    • Training Center / Ankara
    • Training Center / İstanbul
    • Karaköy Ex-head office.
    • Karaköy Ex-head office archives offices fire protection systems by FM 200 (gaseous systems)
    • Heating, cooling, water, refinement and sanitary installations at Alanya resort village owned by PEYS
    • Mersin, warehouse fire protection systems installation.



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    < Back







    PROJECT: TEKFENBANK HEAD OFFICE (EUROBANK TEKFEN)
    Date of Completion: 1995

    Please click here to enlarge
    Construction Area: 5.000 m2
    Description of the Work: Mechanical installations and automatic control systems of Tekfenbank Head Office Building.
    • Preparation of preliminary & execution project, B.O.Q.and specifications,
    • Heating,
    • Cooling,
    • Ventilation,
    • Fire protection,
    • Sanitary,
    • Sewage installations ,
    • Electrical control panels,
    • Automatic control systems.

    < Back







    PROJECT: TEKFENBANK BRANCHES

    HVAC Project and installations of Tekfenbank branches :

    1. Adana
    2. Altunizade / İstanbul
    3. Ankara
    4. Antalya
    5. Avcılar / İstanbul
    6. Bahçekapı / İstanbul
    7. Bakırköy / İstanbul
    8. Bayrampaşa / İstanbul
    9. Bursa
    10. Cağaloğlu / İstanbul
    11. Etiler / İstanbul
    12. Gebze / Kocaeli
    13. Güneşli / İstanbul
    14. İzmir
    15. Kadıköy / İstanbul
    16. Konya
    17. Maltepe / İstanbul
    18. Mecidiyeköy / İstanbul
    19. Merter / İstanbul
    20. Ostim / Ankara
    21. Suadiye / İstanbul
    22. Şişli / İstanbul
    23. Taksim / İstanbul
    24. Ümraniye / İstanbul
    25. Zonguldak
    26. Bank Ekspres Leasing / İstanbul
    27. Bank Ekspres Factoring / İstanbul



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    < Back







    PROJECT: TEKFEN CONSTRUCTION CO.
    Date of Completion: 1995

    Please click here to enlarge
    Description of the Work: Mechanical installations and automatic control systems of Tüpraş İzmit Rafinery Unicracker and connected units.

    West Deutsche Landes Bank (Europa) AG Central Building İstanbul


    < Back







    PROJECT: DOĞUŞ HOLDİNG CO.
    Date of Completion: 1997

    Please click here to enlarge
    Construction Area: 4.500 m2
    Description of the Work: Mechanical installations and automatic control systems of Doğuş Holding CO. Head Office Building.
    • Preparation of preliminary & execution projects, B.O.Q.and specifications.
    • Heating,
    • Cooling,
    • Ventilation,
    • Fire protection,
    • Sanitary installations,
    • Electrical control panels,
    • Automatic control systems.

    Main characteristics:

    Total heating capacity: 516.000 kcal/h

    Total cooling capacity: 417.000 kcal/h

    Total air volume: 30.000 m3/h


    < Back







    PROJECT: DOĞUŞ CONSTRUCTION TRADING CO.
    Date of Completion: 1993

    Please click here to enlarge
    Construction Area: 11.000 m2
    Description of the Work: Mechanical installations and automatic control systems of Doğuş Yapı Sanayi CO. Head Office Building.
    • Preliminary and execution projects,
    • Heating,
    • Cooling,
    • Ventilation,
    • Fire protection ,
    • Sanitary installations,
    • Automatic control systems.

    < Back







    PROJECT: GARANTİ INVESTMENT BANK
    Date of Completion: 1994

    Please click here to enlarge
    Construction Area: 3.000 m2
    Description of the Work: Mechanical installations and automatic control systems of Garanti Yatırım Bank Head Office Building. Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin

    < Back







    PROJECT: GARANTİ LEASING
    Date of Completion: 1994

    Please click here to enlarge
    Construction Area: 2.000 m2
    Description of the Work: Mechanical installations and automatic control systems of Garanti Leasing Head Office Building. Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin Mühendislik,Etkin

    < Back







    PROJECT: TANSAŞ SUPERMARKET

    HVAC and cold room design and installations of Tansaş Supermarkets.

    1 Afyon /Afyon 51 Gaziemir /İzmir
    2 Alaşehir /Manisa 52 Girne /İzmir
    3 Alsancak /İzmir 53 Girne-2 /İzmir
    4 Altındağ /İzmir 54 Göztepe /İstanbul
    5 Altıntaş /İzmir 55 Güzelyalı /İzmir
    6 Altunizade Head Office /İstanbul 56 Halilrıfat /İzmir
    7 Antalya /Antalya 57 Horon Gıda /Ankara
    8 Arnavutköy /İstanbul 58 İstanbul Caddesi /İstanbul
    9 Atakule /Ankara 59 Kadıköy /İstanbul
    10 Bahçelievler /İstanbul 60 Karşıyaka Çarşıiçi /İzmir
    11 Bahçeliveler /İzmir 61 Kartal /İstanbul
    12 Bakırköy /İstanbul 62 Kazımdirik /İzmir
    13 Balgat /Ankara 63 Kemer Country /İstanbul
    14 Balıkesir - 1 /Balıkesir 64 Konak-1 /İzmir
    15 Balıkesir - 2 /Balıkesir 65 Kozyatağı-3 /İstanbul
    16 Balıkesir - 3 /Balıkesir 66 Kuşadası AVM /Aydın
    17 Basın Sitesi /İzmir 67 Kuşadası Çarşı İçi /Aydın
    18 Bayrampaşa /İstanbul 68 Küçükçekmece /İstanbul
    19 Bodrum AVM /Muğla 69 Küçükyalı /İstanbul
    20 Bodrum Konacık /Muğla 70 Levent /İstanbul
    21 Bodrum Marina /Muğla 71 Manavkuyu /İzmir
    22 Bodrum Torba /Muğla 72 Manisa /Manisa
    23 Bornova /İzmir 73 Marina /Muğla
    24 Bornova Stadyum /İzmir 74 Marmaris AVM /Muğla
    25 Bozkaya /İzmir 75 Marmaris İçmeler /Muğla
    26 Buca-1 /İzmir 76 Merter /İstanbul
    27 Buca-2 /İzmir 77 Moda /İstanbul
    28 Burhaniye /Balıkesir 78 Namık Kemal /İstanbul
    29 Çağlayan /İstanbul 79 Narlıdere AVM /İzmir
    30 Çekmeköy /İstanbul 80 Nazilli /Aydın
    31 Çeşme AVM /İzmir 81 Onur /İzmir
    32 Çeşme Dalyan /İzmir 82 Regata /İstanbul
    33 Çeşme Şantiye /İzmir 83 Salihli /Manisa
    34 Çiğli AVM /İzmir 84 Selçuk /İzmir
    35 Denizli - 1 /Denizli 85 Selmayiğitalp /İzmir
    36 Denizli - 2 /Denizli 86 Sincan /Ankara
    37 Denizli - 3 /Denizli 87 Soma /Manisa
    38 Denizli AVM /Denizli 88 Suadiye /İstanbul
    39 Didim İşletmesi /Muğla 89 Şirinyer /İzmir
    40 Dikili- 1 /İzmir 90 Turgutreis /Muğla
    41 Dudullu Yeni Ofis /İstanbul 91 Yeniköy /İstanbul
    42 Egekent /İzmir      
    43 Evka-1 /İzmir      
    44 Evka-4 /İzmir      
    45 Evka-5 /İzmir      
    46 Eyüp /İstanbul      
    47 Fatih /İstanbul      
    48 Fenerbahçe /İstanbul      
    49 Fıstıkağacı /İstanbul      
    50 Foça /İzmir      

     




    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    < Back







    PROJECT: ESBANK BRANCHES

    HVAC project and installations of Esbank branches;

    1. Adana
    2. Adapazarı
    3. Anafartalar / Ankara
    4. Antalya
    5. Bakırköy/İstanbul
    6. Başkent / Ankara
    7. Bayrampaşa/ İstanbul
    8. Bayrampaşa 2 / İstanbul
    9. Bornova / İzmir
    10. Bursa
    11. Denizli
    12. Eminönü / İstanbul
    13. Eskişehir
    14. Etiler/ İstanbul
    15. Galata / İstanbul
    16. Gaziantep
    17. İzmir
    18. İzmit / Kocaeli
    19. Kadıköy / İstanbul
    20. Karaköy / İstanbul
    21. Kartal / İstanbul
    22. Konya
    23. Merkez / Eskişehir
    24. Merter / İstanbul
    25. Suadiye / İstanbul
    26. Ümraniye / İstanbul



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    < Back







    PROJECT: BANK BRANCHES

    GARANTİ BANK

    • Karaköy Branch Exhibition Hall
    • Mecidiyeköy Branch
    • Ortaklar Branch
    • İzmit Branch
    • Esentepe Branch

    TÜRKİYE VAKIFLAR BANK

    • Nişantası Branch
    • Harbiye Branch
    • Mecidiyeköy Branch

    T. EMLAK BANK

    • Conference and sport halls.
    • Antalya Ali Çetinkaya Branch
    • Aydın Branch
    • Marmaris Branch
    • Karagümrük Branch
    • 4.Levent Branch

    TOPRAKBANK

    • Şişli Branch.
    • Ümraniye Office Branch.

    T. EKONOMİ BANK

    • Gayrettepe Branch

    HSBC BANK

    • İzmir/Alsancak Branch

    TRANS ARABİAN INVESTMENT BANK

    • Heating and cooling installation of the office branch in Istanbul.

    WESTDEUTSCHE LANDES BANK (EUROPE) AG

    • Heating, cooling, ventilation, sanitary and fire protection systems design and installation of Head Office.



    Please click here to enlarge



    Please click here to enlarge



    < Back







    PROJECT: ..AND OTHERS (1988-2003)

    Heating, cooling, Ventilation and Automatic control installations completed by us.

    • Tekfen Ampul Fabrikası
    • Efes Pilsen Spor Salonu
    • Sağmalcılar Cezaevi
    • Bahar Pub Cafeteria
    • Alanya Sedir Hotel
    • Ege Tarım CO.
    • Günay Restaurant
    • Hewlett Packard Bilgisayar ve Ölçüm Sistemleri CO.
    • Karmen Deri San.ve İhracat CO.
    • Aktif Finans Factoring
    • Bella Cafeteria / İstanbul
    • Organon İlaçları CO.
    • Gümüşsuyu Halı San.ve Tic.CO.
    • Türkinvest A.O.G. Menkul Kıymetler CO.
    • Yücel Boru CO.
    • İ.A.K.M.D
    • Cue Point
    • Mc Kinsey
    • Narin Tekstil CO.
    • K.K.T.C. Girne Clup Aphrodite
    • Fresenius Medical Care GmbH
    • Sollac Ambalaj Çeliği San.ve Tic.CO.
    • Uginox San.Tic.CO.
    • Sanofi-Doğu İlaç fabrikası
    • Cumhurbaşkanlığı Tarabya Kompleksi /İstanbul
    • Doğuş Holding CO.'ye ait diğer birimler;
         *Garanti Leasing
         Merter Şubesi/Adana Şubesi
         *Garanti Bankası Sergi Salonu
         *Garanti Yatırım Bankası
         Alsancak Şubesi
         *Garanti Menkul Değerler
         Taksim Şubesi
         *Done Dondurulmuş Gıda San.CO.
         Taksim Şubesi/Mecidiyeköy Şubesi
         Bosch Fren Sistemleri San.ve Tic.CO.
         Bosch Isıtma Ürünleri San.ve Tic.CO.



    Please click here to enlarge




    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    < Back







    PROJECT: ..AND OTHERS (2003-2007)

    TOPÇU İNŞAAT TURİZM VE TİC.CO.

    • Project design and mechanical installations of Avcılar Dialysis Center.
    • Project design and mechanical installations of Kahramanmaraş Dialysis Center.
    • Project design and mechanical installations of Esenyurt Dialysis Center.
    • Project design and mechanical installations of Ankara Dialysis Center.

    FACO CO.

    • Additional fire protection installations.

    DOĞUŞ OTOMOTİV

    • Project design and mechanical installations of Doğuş Building's 8th floor.
    • Fire protection installations of Doğuş Auto Gebze Plant's.
    • Mechanical installations water treatment plants and cafe's heating,cooling installations of Doğuş Logistic Co.

    TFF -TÜRKİYE FUTBOL FEDERASYONU

    • Underground mechanical installations of Atatürk Olympic Stadium.

    METEM TEKSTİLCO.

    • Project design and mechanical installations of Çorlu Textile Factory Buildings.

    MEGA TEKSTİL CO.

    • Project design of Mega Textile Bursa Administration Buildings.

    OYAK BANK CO.

    • Natural gas system mechanical installations of Oyakbank General Management Building.

    GARANTİ BANK CO.

    • Project design and mechanical installations of Exhibition Hall (Karaköy)

    AL-DAR HOSPITAL

    • Project design and preparation of material listings, BOQ of Al-dar Hospital.



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    Please click here to enlarge



    < Back